We work hard to be considerate neighbours whilst construction is taking place. The information below outlines key information on what you can expect from site and how we work to minimise our impact on our neighbours.
Mon-Fri: 8am to 5.30pm
Sat: 8am to 1pm
Sundays & Public Holidays: no working
It should be noted that whilst no construction or unloading will happen outside of these hours people may be present earlier to enable them to start work promptly. In this instance vehicles will be switched off and not left idling and staff/visitors can make use of the staff facilities at the site compound.
As part of our commitment to maintaining a clean environment leading to our site and for our neighbours we:
These actions and through regular monitoring will help reduce the possibility of mud/dust/dirt entering the local road network.
Careful consideration has been given to the site set up to ensure where possible that activities that create dust are located as far away from neighbours as possible. Where it is necessary, additional screens will be erected around dusty activities (this is in addition to the hoarding around the site boundary). Furthermore, dust will be minimised during cutting operations by ensuring machinery is fitted with on-tool water suppression.
During drier periods where dust creation may be more of an issue, we use a water bowser to dampen down site roads to reduce dust generation from vehicle and plant movements.
The nature of construction activities does unfortunately mean they can be noisy. We are committed to ensuring our contractors adhere to Environmental Health requirements and current regulations on this as well ensuring all works are only undertaken during the permitted working hours.
In addition, we ask that:
We have a dedicated on site parking area for staff, contractors and deliveries. Anyone who comes to site are informed that they must park on site and not on neighbouring roads. Signage on site reminds people of this obligation and the gate men actively seek to move on any site visitors who look to park outside. Those people making deliveries to the site are not permitted to queue outside.
We ask that no deliveries of materials to site take place during peak times, so as to try and minimise any disruption to the local highway network during these times.